How to Calculate Part-Time Hours

Part-time maths looks simple until the schedule changes every week, or someone asks what 0.6 of a full-time salary, leave allowance or pension contribution actually is. This guide covers the three calculations part-time work really needs: the weekly hours, the FTE fraction, and the pro-rata figures that follow from it.

By Johnson Ramzan · Updated October 24, 2026

Open the Hours Calculator

Just need the number? Work out any single day with the free hours calculator - start, finish, break - then use the weekly and fraction methods below to turn days into contract figures.
Home / Guides / Calculate Part-Time Hours

Part-time work covers everything from a single Saturday shift to a four-day week that is nearly full time, so there is no single schedule to calculate. What every part-time arrangement does have is a relationship to a full-time equivalent: the same job done full time. Nearly every number you will ever need - pay, leave, notice periods, training allowances - is found by working out your hours, expressing them as a fraction of the full-time hours, and applying that fraction fairly. Get the fraction right and the rest is multiplication.

Step one: the weekly hours

For a fixed schedule, multiply the shift length by the number of shifts, taking unpaid breaks off each shift first. Three days a week at 9:00 AM to 3:30 PM with a 30-minute unpaid lunch is 6 paid hours a day, three times over: 18 hours a week. For a salaried part-timer quoted in annual terms, run it backwards: contracted annual hours divided by 52 gives the weekly figure, so 936 annual hours is an 18-hour week. And if your contract states hours per month, divide by 4.33, the average number of weeks in a month - 80 hours a month is about 18.5 hours a week. Whichever direction you travel, land on the weekly number, because everything else is built from it.

Step two: the FTE fraction

FTE stands for full-time equivalent, and the fraction is your weekly hours divided by the full-time weekly hours for the same role. Eighteen hours against a 40-hour standard is 18 / 40 = 0.45 FTE. Twenty-four hours against the same standard is 0.6 FTE. One warning: use your employer's full-time figure, not a generic 40. If full time where you work is 37.5 hours, then 24 hours is 24 / 37.5 = 0.64 FTE, and using 40 as the base would understate every pro-rata entitlement you have. The fraction looks like a small piece of arithmetic; it is actually the foundation of the whole arrangement, so it deserves the correct denominator.

A laptop, a notebook and a cup of coffee on a desk, seen from above - How to Calculate Part-Time Hours
Every part-time figure flows from one fraction: your hours divided by the full-time hours for the same job.

Step three: pro-rata pay, leave and allowances

With the fraction in hand, pro-rata calculations are one multiplication each. Take a role paying $52,000 full time, worked at 0.6 FTE: the salary is $52,000 x 0.6 = $31,200. Leave follows the same pattern. Twenty days of annual leave at 0.6 FTE is 12 days - but days are clumsy when your working day is shorter or your week is uneven, so many employers convert leave to hours. If the full-time leave entitlement is 160 hours, yours is 160 x 0.6 = 96 hours, taken in whatever chunks your schedule needs. Public holidays get the same treatment: you are entitled to the fraction of them, which in practice means the ones falling on your working days plus a balancing adjustment for the ones that do not. If any pro-rata figure you are given cannot be traced back to your fraction times the full-time figure, ask for the working - it should always reconcile.

Changing rotas: average the actual hours

Plenty of part-time schedules refuse to sit still: 18 hours one week, 26 the next, 22 after that. For those, the honest weekly figure is an average of actuals. Add the hours over a representative period - four weeks is the usual choice, twelve for very seasonal work - and divide by the weeks. Weeks of 18, 22, 26 and 22 hours total 88, an average of 22 hours a week. Against a 40-hour standard that is 0.55 FTE for planning purposes. Calculate each day the normal way - start, finish, breaks off - and let the average emerge from real numbers rather than estimating from the rota, which always describes the week that was planned rather than the week that happened. Our guide on totalling hours worked in a week covers the daily-to-weekly method in full.

Part-time hours and overtime

One point deserves its own paragraph because it is so often misunderstood. Overtime law does not distinguish between full-time and part-time staff. Under the US federal rule, any hours actually worked beyond 40 in a single workweek are paid at time and a half, so a part-timer contracted for 20 hours who works 42 in a busy week has 2 overtime hours, exactly like anyone else. What part-time contracts sometimes add is an enhanced rate for hours beyond the contract but below 40 - worth having, but it comes from the contract, not the law. And for the boundary itself, our guide on how many hours a full-time job is explains where each employer's line tends to fall.

Two part-time jobs at once

Plenty of part-timers hold two jobs, and the hours are calculated separately for each - there is no combined timesheet. Work 16 hours for one employer and 20 for another and you have 36 hours of work in your week, but neither employer sees more than their own share. Overtime follows the same separation: the 40-hour threshold applies per employer, so those 36 combined hours contain no overtime at all, while 42 hours for a single employer would contain 2. The exceptions are narrow - mainly where the two employers are really one business under common control. For your own planning, though, the combined figure is the one that matters: total hours across jobs is what decides your real weekly load, your commuting time and whether a third commitment is sensible. Add both jobs' days into one personal record, even though payroll keeps them apart.

Try it the fast way

Build each day with the hours calculator, add the days for the week, then divide by your workplace's full-time hours to get your fraction. Once you have the fraction, the time calculator on the homepage will handle the pro-rata multiplications and totals without fuss.

Frequently asked questions

How many hours a week counts as part time?

Generally anything below your employer's full-time line. Most employers draw that line at 35 or 40 hours, and US statistics treat 1 to 34 hours a week as part time. There is no single legal definition, so a 32-hour week can be full time at one company and part time at another. Your contract's stated hours are what count.

How do I work out my FTE?

Divide your weekly hours by the full-time weekly hours for the same job. Working 24 hours where full time is 40 gives 24 divided by 40, which is 0.6 FTE. That one fraction then drives pro-rata salary, leave and most allowances, so it is worth calculating carefully and keeping with your contract.

How is part-time holiday entitlement calculated?

Multiply the full-time entitlement by your FTE fraction. If full-timers get 20 days plus public holidays and you work 0.6 FTE, your leave is 12 days plus the pro-rata share of public holidays, often converted into hours so it can be taken flexibly. Calculating the entitlement in hours - 0.6 of the full-time hours figure - is usually the fairest method for irregular schedules.

Do part-time workers get overtime pay?

Yes, on the same terms as everyone else. Under US federal law, hours actually worked past 40 in a workweek are overtime, whatever your contract says. Some employers also pay an enhanced rate once you pass your contracted hours but before 40 - that is a policy or contract matter, not a legal requirement, so check your own agreement.

How do I average part-time hours that change every week?

Add up the actual hours over a representative stretch - four weeks is a common choice - and divide by the number of weeks. Three weeks of 18, 22 and 26 hours average 22 hours a week. Employers use the same averaging approach for holiday pay and for checking which side of a benefits threshold a variable schedule falls on.

About the author
Johnson Ramzan builds and maintains every calculator on Time Calculator Tools himself, and he tests each one against worked examples he has done by hand before it is allowed near a reader. His guides follow US Department of Labor guidance on hours worked, overtime and rounding, and he writes them the way he would want a payslip explained to him: plain English, real numbers, and no step skipped. When a reader writes in with a shift pattern the tools handle badly, fixing it goes to the top of his list.
Last updated: October 24, 2026

Related guides

How Many Hours Is a Full-Time Job?

Where the 40, 37.5 and 30-hour lines come from, with monthly and yearly totals.

Read the guide

How to Calculate Hours Worked in a Day

The daily method underneath every schedule: span, minus breaks, in decimal hours.

Read the guide

How to Estimate Hours Worked for Salaried Staff

Reasonable ways to track and estimate time when there is no clock to punch.

Read the guide

How to Total Hours for a Timesheet

Lay out a timesheet so weekly and monthly totals check themselves.

Read the guide