How Contractors Can Track and Total Their Hours

A contractor's hours live in vans, on sites and across three jobs at once - which is exactly why they leak. This guide sets out a tracking habit that survives a real working week, what to record, and how to turn the log into totals a client cannot argue with.

By Johnson Ramzan · Updated October 24, 2026

Open the Hours Calculator

Just need the number? The free hours calculator turns any start and finish time into a daily total in hours, minutes and decimals. This guide is about the recording system that feeds it, day after day.
Home / Guides / Track Contractor Hours

Employees have a clock on the wall and a payroll department keeping score. Contractors have neither. Your hours are your invoice, your invoice is your income, and the only record of either is the one you make yourself. Yet most contractors track time the way they did on their first job: a few numbers scribbled on a dashboard pad, tidied up - from memory - the night before the invoice goes out. Memory is a generous witness for everything except the small pieces, and the small pieces are where a contractor's week actually goes: the 40 minutes waiting on a delivery, the second site visit, the call-out that ran long.

The fix is not software, although software can help. The fix is a habit with four fields, kept daily, totaled weekly, and agreed with the client as the job runs rather than argued about after it ends.

What to record for every block of work

Four pieces of information turn a scribble into evidence: the date, the start time, the finish time, and a short note of what the work was and where. Add a fifth line for any unpaid break that came out of the day. That is all. You do not need task codes, project management suites or GPS trails - a client querying an invoice is answered by "Tuesday, 7:10 AM to 4:45 PM, second-fix plumbing at the Miller house, 45 minutes lunch," not by a dashboard. Record the times when they happen or at the latest the same evening. A start time written down on the day is a fact; the same time reconstructed on Friday is an estimate, and estimates drift in whichever direction makes the writer nervous.

Paper, spreadsheet or app: pick the one you will keep

Every tracking method works if it survives contact with a busy week. A pocket notebook is genuinely hard to beat on site: no battery, no signal needed, and gloves can turn a page more easily than they can tap a screen. A spreadsheet suits contractors who end the day at a desk - one row per block, with a column that converts each span to decimals, does the weekly adding for you. Timer apps suit people who switch between clients several times a day, because one tap starts the next block and stops the last. The honest test is week six, not day one: whichever system you are still updating when the job gets hectic is the right system. Many contractors run a hybrid - notebook on site, ten minutes transferring the day into a spreadsheet each evening, which also forces a daily check that nothing was missed.

Hands inserting a time card into an analog punch clock - How Contractors Can Track and Total Their Hours
Notebook, spreadsheet or app - the best system is the one still being filled in during week six of the job.

A worked week, totaled properly

Here is one contractor's week, logged the way described above, with each day converted to decimals as it was totaled. Monday: 7:10 AM to 4:45 PM with 45 minutes for lunch - a span of 9 hours 35 minutes, minus lunch, is 8 hours 50 minutes, or 8.83. Tuesday: two sites, 7:30 AM to 12:15 PM and 1:00 PM to 5:20 PM, which is 4 hours 45 plus 4 hours 20, totaling 9 hours 5 minutes, or 9.08. Wednesday: 8:00 AM to 3:30 PM with 30 minutes lunch - 7 hours, or 7.00. Thursday: 7:15 AM to 5:45 PM with an hour for lunch and a parts run - 9 hours 30 minutes, or 9.50. Friday: a short day, 7:40 AM to 1:10 PM, no lunch taken - 5 hours 30 minutes, or 5.50. Add the decimals: 8.83 + 9.08 + 7.00 + 9.50 + 5.50 = 39.91 hours. At $45 an hour, the week's invoice is 39.91 x 45 = $1,795.95. Notice what the log gives you beyond the total: Tuesday's two sites are separated, Thursday's long day is explained, and every figure can be traced back to real start and finish times if the client asks.

Multiple clients, multiple sites, one log

Contractors rarely work for one client in one place, and the log has to keep the streams separate or the invoices tangle. The rule is one line per block per client: when you leave the Miller job and drive to the Patel job, the Miller line closes and a Patel line opens, with the drive as its own line if your agreement bills travel. Trying to hold two clients in one daily total and split it later never works - the split is invented, and both clients get a number neither can verify. Separate lines also protect you the other way: if one client pays late or disputes a figure, the other client's clean record is untouched. For the daily spans themselves, running each start and finish pair through the hours calculator as you write the log keeps every line in decimals from the start, so Friday's total is pure addition.

Get the week agreed before it becomes an invoice

The strongest habit in this guide costs two minutes: send the client the week's hours every Friday - a photo of the log page or a short email with the daily totals - and let them nod it through while the work is fresh in their mind too. Silence or a thumbs-up in week two makes the final invoice a formality. Contractors who skip this step meet all the questions at once, at the end, when the client is looking at the biggest possible number and their own memory of the job has faded. Weekly sign-off also catches honest misunderstandings early, like a client who believed Saturdays were included in a fixed price, while there is still time to adjust the work rather than the relationship.

Try it the fast way

The hours calculator on this site converts any start and finish pair into hours, minutes and decimals in one step - ideal when you are writing up the day. For adding several separate blocks from a split day into one figure, the time calculator on the homepage adds lengths of time together directly.

Frequently asked questions

Do contractors need to record their breaks?

If you bill by the hour, yes - at least the unpaid ones. A day logged as 7:00 AM to 5:30 PM with no break recorded looks like 10.5 billable hours, and a client who knows you took an hour for lunch will query the whole invoice, not just that day. Record the lunch break and the honest 9.5 hours goes through without a murmur. Paid short breaks usually stay inside the day and do not need their own lines.

How long should I keep my hour records?

Keep them at least as long as your tax records - in most places that means five to seven years. Hour logs support your invoices, your invoices support your tax return, and a client dispute or a tax question can arrive long after the job is finished. Digital logs cost nothing to store, so there is no reason to throw them away sooner.

What happens if a client disputes my hours?

A dated log with start and end times, locations and task notes is usually the end of the argument - it is very hard to dispute a record made on the day against a memory from a month later. This is why weekly sign-off matters: a client who approved each week's hours as the job went along has almost no ground to reject the final total. Without records, the dispute becomes your word against theirs, and the person holding the money usually wins those.

Should I track travel time between job sites?

Track it, and agree the billing treatment before the job starts. Many contractors bill travel between sites during the day at the full or a reduced rate, and the trip from home to the first site not at all - but customs vary by trade and contract. What matters is that the log shows the travel as its own line, so whatever was agreed can be applied cleanly at invoice time.

What is the simplest tracking system that actually works?

The one you will still be using in week six. For most solo contractors that is a notebook or phone note with four columns - date, start, finish, and what the work was - filled in at the end of each day, plus a ten-minute Friday total. Apps with one-tap timers work just as well if you prefer them. The system matters far less than the habit: same-day entries, every day, no reconstruction from memory.

About the author
Johnson Ramzan builds and maintains every calculator on Time Calculator Tools himself, and he tests each one against worked examples he has done by hand before it is allowed near a reader. His guides follow US Department of Labor guidance on hours worked, overtime and rounding, and he writes them the way he would want a payslip explained to him: plain English, real numbers, and no step skipped. When a reader writes in with a shift pattern the tools handle badly, fixing it goes to the top of his list.
Last updated: October 24, 2026

Related guides

How to Calculate Billable Hours as a Freelancer

What counts as billable, how to round honestly, and how a week becomes an invoice.

Read the guide

How to Total Hours for a Timesheet

The step-by-step addition method, with a full week worked end to end.

Read the guide

How to Work Out Hours From Clock In and Clock Out

Two punches, one span: the minutes method, four-punch days and overnight finishes.

Read the guide

How to Calculate Hours Worked in a Fortnight

Fortnightly pay periods explained, with weekly overtime kept separate.

Read the guide